Sadashiv Puram Road

Construction of 18 DP, Cement Concrete Road from Royal Park Circle to Green City Road in AMC Area,Ambarnath East.

Client

Ambarnath Municipal Council

Location

Technical Drawings

Sadashiv Puram Road — Civikor page content

Civikor · Roads · page content

Sadashiv Puram Road

18 m + 12 m DP legs · Ambarnath

/sadashiv-puram-road/ Ambarnath Municipal Council ~672 words
Heads up: Live page carries the wrong project description — see audit note.

Sadashiv Puram to B Cabin Road — opening up a landlocked residential pocket

Sadashiv Puram sits between the Central Railway line and Ambarnath's inner road network, reached until now by part-width lanes that stop short of the Development Plan reservation. Civikor surveyed and designed a two-leg DP road — an 18 m north–south link and a 12 m east–west connector — that gives the pocket a direct, full-width route out to B Cabin Road.

At a glance

ProjectConstruction of DP cement concrete road from Sadashiv Puram to B Cabin Road (Aqua Marine stretch), AMC Area
ClientAmbarnath Municipal Council
LocationSadashiv Puram, Ambarnath, Dist. Thane, Maharashtra
ConfigurationTwo DP legs — 18.00 m wide north–south link and 12.00 m wide east–west connector
Corridor length[CONFIRM — see note]
Pavement typeRigid — cement concrete
Civikor's roleSurvey, DP alignment marking, design drawings and project management consultancy
StatusOngoing

The brief

The neighbourhood around Sadashiv Puram Society has densified steadily — Parshuram Residency, Aqua Marine, Patwelkars, Sai Imperza and Javdeep Tower now sit along a corridor whose Development Plan road had never been built to width. Traffic from all of them funnels onto B Cabin Road through constrained lanes, with the Central Railway line closing off any alternative to the south-east.

Ambarnath Municipal Council needed the reserved DP width established on the ground, and a road built to carry the pocket's growing load rather than merely resurface the existing track.

Scope of work

  • DP plan interpretation — the sanctioned Development Plan sheet read against the ground to fix both legs of the alignment: an 18.00 m road running north from the internal junction, and a 12.00 m road running west toward the existing 18 m arterial.
  • Location plan at 1:500 setting the alignment against Sadashiv Puram Society, Parshuram Residency, Aqua Marine, Patwelkars, Sai Imperza, Javdeep Tower, Navare Nagar Road, Rahul Estate Road and B Cabin Road.
  • Google location plan for satellite verification of the corridor and its junctions.
  • Rigid pavement and drainage design to AMC's standard concrete road section.
  • Project management consultancy through execution.

How we approached it

Two widths, one continuous route

The corridor is not a single straight link. It steps: an 18 m leg serving the denser residential frontage, meeting a 12 m leg that carries the connection west to the existing arterial. Designing them as one project — rather than two separate works — keeps the junction geometry, drainage fall and pavement levels continuous, which is where stitched-together municipal roads usually fail.

Working against a hard boundary

The Central Railway line and B Cabin Road fix the corridor's eastern edge absolutely; the gaothan and reserved plots fix the west. There is no alignment flexibility here, so the design effort went into fitting the full DP width and its drainage inside a corridor that cannot be widened later.

Landmark-referenced approvals

Every plan names the societies and buildings it passes. For a municipal council reviewing an alignment through occupied land, a drawing that says "Aqua Marine" and "Javdeep Tower" is checked and approved faster than one that only gives coordinates.

Why it matters

  • A landlocked pocket gets a real exit. Residents reach B Cabin Road and the wider network on a full-width surfaced road instead of a constrained internal lane.
  • DP width secured before it is lost. Building the reservation now protects it from the encroachment that has already narrowed comparable corridors in Ambarnath.
  • Emergency access. An 18 m carriageway means ambulances and fire tenders can reach the interior of the pocket — something the previous section could not guarantee.
  • Rigid pavement suited to monsoon conditions and to a corridor where future resurfacing closures would be difficult to divert around.

Drawing set

  1. Location plan (1:500) — Sadashiv Puram to Aqua Marine, alignment against named societies and roads.
  2. Google location plan — corridor on satellite imagery.
  3. DP plan — Sadashiv Puram to B Cabin Road, showing the 18.00 m and 12.00 m DP road legs over the sanctioned Development Plan sheet.

Have a Similar Project in Mind?

Let’s discuss how we can help bring your infrastructure vision to life.